shouldersportstent

Swimming

Air-Supported Swimming Complex

Intelligent Climate Control Precisely maintains a constant pool temperature (26-28°C) and air temperature, enabling 365-day operation and eliminating seasonal restrictions.

Energy-efficient design reduces lighting energy consumption through membrane material transparency, combined with heat recovery technology to significantly lower swimming pool operational costs.

Provides a pure, unobstructed space, enabling flexible design of Olympic-sized pools and multi-lane configurations, with an open visual experience and unparalleled safety.

This air dome has transformed our swimming experience! The water and air temperature are always perfectly balanced - no more choking on chlorine fumes or shivering when you get out. It feels like swimming in a luxury tropical resort every day, regardless of the weather outside. The air is fresh, the space is bright, and our membership has doubled since opening!

- John Henry

Features of Project

Year-Round Swimming
Corrosion-Resistant Environment
Energy Efficient
Healthy Air Quality
Column-Free Space
Anti-Condensation

Working Process

01
Step

Decision-making and design

Define objectives,Determine scale,Site assessment,Budget formulation,Scheme design and approval
02
Step

Construction and installation

Foundation and groundwork,Air membrane structure and equipment installation,Inflation and commissioning
03
Step

Daily operations

Smart device control and adjustment,Personnel management
04
Step

Maintenance and servicing

Daily inspections,Regular servicing,Emergency response

Project Information

Client Name

Isabella Clarke

Category

Air Dome Swimming

Start Time

June 1, 2020

End Time

June 20, 2020

Budget

Screenshot Contact us

Location

Oceania

Have a
project in
mind?

Get a Quote

Shoulder Team has a great team of skilled architects ready to support your project at any time.